<?xml version="1.0" encoding="UTF-8"?>
<!-- generator="wordpress/2.0.11" -->
<rss version="2.0" 
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	>

<channel>
	<title>Bike Emory</title>
	<link>http://bike.emory.edu</link>
	<description>Why not?</description>
	<pubDate>Wed, 11 Nov 2009 18:59:47 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.0.11</generator>
	<language>en</language>
			<item>
		<title>Latest Update on Candler Field Path</title>
		<link>http://bike.emory.edu/2009/11/11/latest-update-on-candler-field-path/</link>
		<comments>http://bike.emory.edu/2009/11/11/latest-update-on-candler-field-path/#comments</comments>
		<pubDate>Wed, 11 Nov 2009 18:56:20 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/11/11/latest-update-on-candler-field-path/</guid>
		<description><![CDATA[See the latest update from Emory's Campus Services about the improvements to the Candler Field path.  Also note that a ramp will be installed where the path meets Old Briarcliff Road.  This is a direct result of your comments received through Bike Emory.  Thank you for raising this issue to our attention!]]></description>
			<content:encoded><![CDATA[<p>See the latest update from Emory&#8217;s Campus Services about the improvements to the Candler Field path.  Also note that a ramp will be installed where the path meets Old Briarcliff Road.  This is a direct result of your comments received through Bike Emory.  Thank you for raising this issue to our attention!</p>

<h1>From Campus Services:</h1>

<p><strong>Path Lighting</strong></p>

<ul>
<li><p>Installation of path lighting will begin next week alongside the Candler Field path segment.</p></li>
<li><p>This work includes five new light poles and fixtures which will be installed between the path and the creek, two new light poles and fixtures will be installed at the north side of the path near Old Briarcliff Road, and five light fixtures will be strapped to the existing field lighting poles and will provide nighttime lighting.</p></li>
<li><p>The work should wrap up by 11/25.</p></li>
<li><p>The path will remain open during construction, however users will be detoured off into the grass in five areas (for a day) while electrical conduit is placed under the path.</p></li>
</ul>

<p><strong>Bike Ramp</strong></p>

<ul>
<li>A ramp will be cut into the existing curb and sidewalk at Old Briarcliff Road near the Candler Field path late next. This will allow bikers to access the path without jumping the curb.</li>
</ul>

<p><strong>Miscellaneous Site Work</strong></p>

<ul>
<li><p>Some minor grading work will occur next to the path and near the dugout, this will address erosion issues.</p></li>
<li><p>Placement of gravel near the equipment entrance will take place next week.</p></li>
</ul>

<p><strong>SIDEWALK AND PEDESTRIAN CANOPY AT CSX TRESTLE</strong></p>

<ul>
<li><p>The pedestrian canopy is nearing completion.</p></li>
<li><p>Metal roof installation is underway.</p></li>
<li><p>Fencing and lighting installation to occur in two weeks.</p></li>
</ul>

<p>Site Work</p>

<ul>
<li><p>An old power pole will be removed tomorrow or Friday near the new pedestrian canopy.</p></li>
<li><p>Sidewalk pour and place shall occur next week.</p></li>
<li><p>After sidewalk completion, final grading and landscaping will take place.</p></li>
<li><p>Sidewalk striping to occur in two weeks.</p></li>
</ul>

<p>The path and CSX areas will see much activity over the next two weeks, however the project is nearing final completion with exception to some ongoing storm water issues.</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/11/11/latest-update-on-candler-field-path/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Bike To Campus Day a Success</title>
		<link>http://bike.emory.edu/2009/10/30/bike-to-campus-day-a-success-2/</link>
		<comments>http://bike.emory.edu/2009/10/30/bike-to-campus-day-a-success-2/#comments</comments>
		<pubDate>Fri, 30 Oct 2009 19:34:57 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/30/bike-to-campus-day-a-success-2/</guid>
		<description><![CDATA[Thank you to everyone who participated in Bike to Campus day!  The turnout was great and it is always fun to ride with the group to campus and own the road as a group.

Special thanks to Bicycle South for hosting and co-sponsoring the event and to Chocolate for provide the coffee and bagels at a discount.]]></description>
			<content:encoded><![CDATA[<p>Thank you to everyone who participated in Bike to Campus day!  The turnout was great and it is always fun to ride with the group to campus and own the road as a group.</p>

<p>Special thanks to Bicycle South for hosting and co-sponsoring the event and to <a href="http://www.mychocolatecoffee.com/" title="Chocolate">Chocolate</a> for provide the coffee and bagels at a discount.</p>

<p>Congratulations to the prize winners of the $25 Bicycle South gift certificates as well!</p>

<p>We are planning on doing another ride in the spring.  Stay tuned.</p>

<p>In the mean time stay safe and happy cycling!</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/30/bike-to-campus-day-a-success-2/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Bike To Campus Day Tomorrow!</title>
		<link>http://bike.emory.edu/2009/10/28/bike-to-campus-day-tomorrow/</link>
		<comments>http://bike.emory.edu/2009/10/28/bike-to-campus-day-tomorrow/#comments</comments>
		<pubDate>Wed, 28 Oct 2009 15:26:58 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/28/bike-to-campus-day-tomorrow/</guid>
		<description><![CDATA[Show support for cycling as a commuting choice by biking to TOMORROW. <cms:upload name="Bike To Campus Day 2009" id="626" show="thumb" align="right"/>

Bike Emory is encouraging everyone who lives, works, learns, visits and plays in the area to cycle to your campus to promote the cycling culture in the community.]]></description>
			<content:encoded><![CDATA[<p>Show support for cycling as a commuting choice by biking to TOMORROW.</p>

<div class="image right"><a rel="lightbox" title="Bike To Campus Day 2009" href="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.png"><img src="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.thumbnail.png" alt="Bike To Campus Day 2009"/></a></div>

<p>Bike Emory is encouraging everyone who lives, works, learns, visits and plays in the area to cycle to your campus to promote the cycling culture in the community.</p>

<p>In the morning, riders will meet in front of Bicycle South, located at <a href="http://maps.google.com/maps?f=q&amp;hl=en&amp;geocode=&amp;q=bicycle+south&amp;sll=33.791774,-84.307795&amp;sspn=0.008988,0.018969&amp;ie=UTF8&amp;ll=33.792701,-84.307795&amp;spn=0.008988,0.018969&amp;z=16&amp;iwloc=A" title="2098 North Decatur Road">2098 North Decatur Road</a>, at 8 a.m. where a free breakfast  will be provided.</p>

<p>Cyclists will depart Bicycle South at 8:30 a.m. and ride down North Decatur Road to Clifton Road. As the group turns right onto Clifton Road, participants will head to their final destinations.</p>

<p>Before the ride a $25 Bicycle South gift certificate and cycling gear will be awarded to the cyclist with the longest commute and all riders can enter to win an additional $25 Bicycle South gift certificate.</p>

<p>A link to the flyer for the event is <a href="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.png" title="HERE">HERE</a>.  Please distribute electronically to your cycling networks.</p>

<p>Bicyclists are strongly encouraged to cycle to the start of the Bike to Campus Day event at Bicycle South (corner of Clairmont and North Decatur roads).  There is VERY limited vehicular parking for this event.</p>

<p>Bike Emory supports safe cycling and we strongly encourage all participants in Ride To Campus Day events to wear a helmet.</p>

<p>See you there!</p>

<p>Bike Emory. Why Not?</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/28/bike-to-campus-day-tomorrow/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Bike To Campus Day This Thursday!</title>
		<link>http://bike.emory.edu/2009/10/26/bike-to-campus-day-this-thursday/</link>
		<comments>http://bike.emory.edu/2009/10/26/bike-to-campus-day-this-thursday/#comments</comments>
		<pubDate>Mon, 26 Oct 2009 16:38:39 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/26/bike-to-campus-day-this-thursday/</guid>
		<description><![CDATA[Show support for cycling as a commuting choice by biking to campus on Thursday, October 29. <cms:upload name="Bike To Campus Day 2009" id="626" show="thumb" align="right"/>

Bike Emory is encouraging everyone who lives, works, learns, visits and plays in the area to cycle to your campus to promote the cycling culture in the community.]]></description>
			<content:encoded><![CDATA[<p>Show support for cycling as a commuting choice by biking to campus on Thursday, October 29.</p>

<div class="image right"><a rel="lightbox" title="Bike To Campus Day 2009" href="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.png"><img src="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.thumbnail.png" alt="Bike To Campus Day 2009"/></a></div>

<p>Bike Emory is encouraging everyone who lives, works, learns, visits and plays in the area to cycle to your campus to promote the cycling culture in the community.</p>

<p>In the morning, riders will meet in front of Bicycle South, located at <a href="http://maps.google.com/maps?f=q&amp;hl=en&amp;geocode=&amp;q=bicycle+south&amp;sll=33.791774,-84.307795&amp;sspn=0.008988,0.018969&amp;ie=UTF8&amp;ll=33.792701,-84.307795&amp;spn=0.008988,0.018969&amp;z=16&amp;iwloc=A" title="2098 North Decatur Road">2098 North Decatur Road</a>, at 8 a.m. where a free breakfast  will be provided.</p>

<p>Cyclists will depart Bicycle South at 8:30 a.m. and ride down North Decatur Road to Clifton Road. As the group turns right onto Clifton Road, participants will head to their final destinations.</p>

<p>Before the ride a $25 Bicycle South gift certificate and cycling gear will be awarded to the cyclist with the longest commute and all riders can enter to win an additional $25 Bicycle South gift certificate.</p>

<p>A link to the flyer for the event is <a href="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.png" title="HERE">HERE</a>.  Please distribute electronically to your cycling networks.</p>

<p>Bicyclists are strongly encouraged to cycle to the start of the Bike to Campus Day event at Bicycle South (corner of Clairmont and North Decatur roads).  There is VERY limited vehicular parking for this event.</p>

<p>Bike Emory supports safe cycling and we strongly encourage all participants in Ride To Campus Day events to wear a helmet.</p>

<p>See you there!</p>

<p>Bike Emory. Why Not?</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/26/bike-to-campus-day-this-thursday/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Sharrows On Moreland</title>
		<link>http://bike.emory.edu/2009/10/23/sharrows-on-moreland/</link>
		<comments>http://bike.emory.edu/2009/10/23/sharrows-on-moreland/#comments</comments>
		<pubDate>Fri, 23 Oct 2009 17:53:25 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/23/sharrows-on-moreland/</guid>
		<description><![CDATA[These “homemade” sharrows appeared on Moreland today.  Are cyclists taking on the bicycle infrastructure improvements themselves?  Will planners take note?

<cms:upload name="Moreland Sharrows" id="629" show="gallery" align="gallery"/>]]></description>
			<content:encoded><![CDATA[<p>These “homemade” sharrows appeared on Moreland today.  Are cyclists taking bicycle infrastructure improvements in their own hands?  Will planners take note?</p>

<div class="image gallery"><a rel="lightbox[gallery]" title="Moreland Sharrows" href="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow1small.jpg"><img src="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow1small.gallery.jpg" alt="Moreland Sharrows"/></a></div>

<div class="image gallery"><a rel="lightbox[gallery]" title="Moreland Sharrows" href="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow2small.jpg"><img src="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow2small.gallery.jpg" alt="Moreland Sharrows"/></a></div>

<div class="image gallery"><a rel="lightbox[gallery]" title="Moreland Sharrows" href="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow3small.jpg"><img src="http://bike.emory.edu/wp-content/uploads/images/morelandsharrow3small.gallery.jpg" alt="Moreland Sharrows"/></a></div>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/23/sharrows-on-moreland/feed/</wfw:commentRss>
		</item>
		<item>
		<title>More Americans Cycling to Work and For Business Trips</title>
		<link>http://bike.emory.edu/2009/10/20/more-americans-cycling-to-work-and-for-business-trips/</link>
		<comments>http://bike.emory.edu/2009/10/20/more-americans-cycling-to-work-and-for-business-trips/#comments</comments>
		<pubDate>Tue, 20 Oct 2009 15:05:34 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/20/more-americans-cycling-to-work-and-for-business-trips/</guid>
		<description><![CDATA[Workers that cycling to work is up 43% nationally and now even business travelers are using bikes to save money and stay fit!]]></description>
			<content:encoded><![CDATA[<p>Workers that cycle to work is up 43% nationally and now even business travelers are using bikes to save money and stay fit!</p>

<p>Read more from in the New York Times:  <a href="http://www.nytimes.com/2009/10/20/business/20bicycles.html?_r=1" title="FULL STORY" target="blank">FULL STORY</a></p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/20/more-americans-cycling-to-work-and-for-business-trips/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Bike To Campus Day Details Announced!</title>
		<link>http://bike.emory.edu/2009/10/19/bike-to-campus-day-details-announced/</link>
		<comments>http://bike.emory.edu/2009/10/19/bike-to-campus-day-details-announced/#comments</comments>
		<pubDate>Mon, 19 Oct 2009 14:22:37 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/19/bike-to-campus-day-details-announced/</guid>
		<description><![CDATA[Bike Emory is encouraging everyone who lives, works, learns and plays in the Clifton community to cycle to your campus to promote the cycling culture in the Clifton community.]]></description>
			<content:encoded><![CDATA[<p>Show support for cycling as a commuting choice by biking to campus on Thursday, October 29.</p>

<div class="image right"><a rel="lightbox" title="Bike To Campus Day 2009" href="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.png"><img src="http://bike.emory.edu/wp-content/uploads/images/biketocampus09.thumbnail.png" alt="Bike To Campus Day 2009"/></a></div>

<p>Bike Emory is encouraging everyone who lives, works, learns, visits and plays in the area to cycle to your campus to promote the cycling culture in the community.</p>

<p>In the morning, riders will meet in front of Bicycle South, located at <a href="http://maps.google.com/maps?f=q&amp;hl=en&amp;geocode=&amp;q=bicycle+south&amp;sll=33.791774,-84.307795&amp;sspn=0.008988,0.018969&amp;ie=UTF8&amp;ll=33.792701,-84.307795&amp;spn=0.008988,0.018969&amp;z=16&amp;iwloc=A" title="2098 North Decatur Road">2098 North Decatur Road</a>, at 8 a.m. where a free breakfast  will be provided.</p>

<p>Cyclists will depart Bicycle South at 8:30 a.m. and ride down North Decatur Road to Clifton Road. As the group turns right onto Clifton Road, participants will head to their final destinations.</p>

<p>Prizes will be awarded to the cyclist with the longest commute and more!</p>

<p>Bicyclists are strongly encouraged to cycle to the start of the Bike to Campus Day event at Bicycle South (corner of Clairmont and North Decatur roads).  There is VERY limited vehicular parking for this event.</p>

<p>Bike Emory supports safe cycling and we strongly encourage all participants in Ride To Campus Day events to wear a helmet.</p>

<p>See you there!</p>

<p>Bike Emory. Why Not?</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/19/bike-to-campus-day-details-announced/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Mobile Repair Center Canceled Today</title>
		<link>http://bike.emory.edu/2009/10/14/mobile-repair-center-canceled-today/</link>
		<comments>http://bike.emory.edu/2009/10/14/mobile-repair-center-canceled-today/#comments</comments>
		<pubDate>Wed, 14 Oct 2009 15:37:01 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/14/mobile-repair-center-canceled-today/</guid>
		<description><![CDATA[The Mobile Repair Center has been canceled today, October 14th.

The Mobile Repair Center will return to campus on Friday, October 16th at 11:30 am.
]]></description>
			<content:encoded><![CDATA[<p>The Mobile Repair Center has been canceled today, October 14th.</p>

<p>The Mobile Repair Center will return to campus on Friday, October 16th at 11:30 am.</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/14/mobile-repair-center-canceled-today/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Save The Date!  Ride to Campus Day - 10.29</title>
		<link>http://bike.emory.edu/2009/10/13/save-the-date-ride-to-campus-day-1029/</link>
		<comments>http://bike.emory.edu/2009/10/13/save-the-date-ride-to-campus-day-1029/#comments</comments>
		<pubDate>Tue, 13 Oct 2009 17:32:49 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/13/save-the-date-ride-to-campus-day-1029/</guid>
		<description><![CDATA[Ride To Campus Day will be on Thursday, October 29th this year.   Details are coming soon!
]]></description>
			<content:encoded><![CDATA[<p>Ride To Campus Day will be on Thursday, October 29th this year.   Details are coming soon!</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/13/save-the-date-ride-to-campus-day-1029/feed/</wfw:commentRss>
		</item>
		<item>
		<title>Update on Candler Field Path Repairs</title>
		<link>http://bike.emory.edu/2009/10/01/update-on-candler-field-path-repairs/</link>
		<comments>http://bike.emory.edu/2009/10/01/update-on-candler-field-path-repairs/#comments</comments>
		<pubDate>Thu, 01 Oct 2009 17:35:31 +0000</pubDate>
		<dc:creator>Bike Emory</dc:creator>
		
		<category>News</category>

		<guid isPermaLink="false">http://bike.emory.edu/2009/10/01/update-on-candler-field-path-repairs/</guid>
		<description><![CDATA[See below for an update to the repairs to the Candler Field path repairs and an update on the work to complete the new sidewalk segment under the CSX train bridge on Old Briarcliff road.]]></description>
			<content:encoded><![CDATA[<p>See below for an update to the repairs to the Candler Field path repairs and an update on the work to complete the new sidewalk segment under the CSX train bridge on Old Briarcliff road.</p>

<p>From Emory&#8217;s Campus Services:</p>

<p><strong>Candler Field</strong></p>

<p>• Installation of two drainage wells alongside the Candler Field path is underway and will wrap up this week.</p>

<p>• Construction of the drainage swale and trench drain at the path near the bollards will begin early next week.  This component will be done in two stages; the first section will be the drainage swale at the access gate and the second will be the trench drain and grate at the path.</p>

<p>• The installation of new path lighting will begin in two weeks.  Five new light poles and fixtures will be installed between the path and the creek, two new light poles and fixtures will be installed at the north side of the path near Old Briarcliff Road, and five light fixtures will be strapped to the existing field lighting poles.  This work should wrap up by the third week in October.</p>

<p>• The path will remain open during construction but a small detour off the path will be necessary during construction of the trench and grate.</p>

<p><strong>Sidewalk &amp; Pedestrian Canopy at CSX Trestle</strong></p>

<p>• Construction has finally begun, all CSX required approvals and insurance requirements are in place!</p>

<p>• Erosion control is complete and approved.</p>

<p>• Staking and layout is complete.</p>

<p>• Earthwork and grading is underway.</p>

<p>• Pedestrian Canopy foundation work to begin next week (formwork, reinforcing steel and concrete).</p>

<p>• Upon completion of foundation system the Pedestrian Canopy framing will begin, followed by the roof system which includes the standing seam metal roof.</p>

<p>• After the Pedestrian Canopy is completed the sidewalks will be poured and final grading and landscaping will take place.</p>
]]></content:encoded>
			<wfw:commentRss>http://bike.emory.edu/2009/10/01/update-on-candler-field-path-repairs/feed/</wfw:commentRss>
		</item>
	</channel>
</rss>
